... 总射程:integrated range 总热功率:total thermal power 总能量吸收型探测器:total energy absorption detector ...
基于44个网页-相关网页
Between 2006 and 2008, China has shut down inefficient thermal power plants with a total capacity of 34.21gw, and closed 6028 small coal mines.
2006年至2008年,中国关停小火电机组3421万千瓦,关闭小煤矿6028处。
A novel heat pump ice thermal storage integration scheme based on reducing total mass (including relative power system mass) of thermal control system of spacecraft is presented.
提出了旨在降低热控系统质量的热泵-蓄冷组合热控方案。
When completed, the Barth Supercritical Coal-fired Power Plant will generate a total of 1,980 MW (3 units x 660 MW), making it the largest thermal power plant in Bihar.
一旦完成,Barth超临界燃煤电厂将产生共1980兆瓦( 3台X 660兆瓦)的电力,使得它成为比哈尔邦最大的火电厂。
应用推荐